Programme Content
COURSE BROAD OBJECTIVES Expose participants to the fundamentals of construction project scheduling and monitoring. Provide practical hands-on training in Primavera P6 using construction project cases. Enable participants to understand and apply Earned Value Analysis for project performance monitoring. Introduce the concepts and principles of Lean Construction and the Last Planner Method. Develop participant capability to integrate traditional scheduling techniques with collaborative planning approaches for improved project success. COURSE CONTENTS DAY 1: Basics of Critical Path Method (CPM) Basics of Earned Value Analysis (EVA) Hands-on training of Primavera P6 with construction project cases Development of project schedules in Primavera P6 Cost loading and monitoring using earned value parameters Deliverable: Ability to develop a Primavera P6 schedule, perform cost loading, and monitor earned value parameters for construction projects. DAY 2: Basics of Lean Construction Introduction to the Last Planner Method Workflow reliability and collaborative planning Hands-on exercises using sticky notes to simulate Last Planner implementation Complete planning cycle demonstration using Last Planner concepts Integration of traditional scheduling with Lean Construction practices Deliverable: Knowhow of Lean Construction concepts and the ability to drive a Last Planner-based project implementation in respective projects.
